Near Miss – Steep Slope Tether Line Breaks after Damaged by Bucket Move

BACKGROUND
On a spring day in the Pacific Northwest, the operator of a steep slope harvester on a two-line tethered logging system operation had a near miss when one of the cables broke at the connection socket after it was damaged during base machine repositioning.
PERSONAL CHARACTERISTICS
The operator had over 20 years of experience and had over 500 hours on a tethered system.
UNSAFE ACTS AND CONDITIONS
Before the incident, the operator needed to reposition the base machine to begin cutting a new strip. He disconnected the tether lines and chains from the harvester. The parking brake was set so that the tether lines could not feed in or out of the drums. As he moved the base machine, the tether line termination points dangled near the lower sheaves. While he was digging in the bucket, he heard a “pop” and saw one of the lines whip against the boom. When he finished securing the bucket, he got out of the base machine and reconnected both lines to the steep slope machine. He glanced at the termination points while hooking them up but did not stop to inspect them thoroughly. When he finished hooking up, he got into the steep slope machine (SSM), took up the slack in the lines, and put it into automatic mode.
ACCIDENT / INJURY
The operator began walking the machine down the 40% slope. After just a few feet, he felt a jerk from the direction of the base machine behind him up the hill. He looked back and saw that one of the tether lines had broken at the termination point. He immediately stopped the machine and called his supervisor.
The 7/8” swaged wire rope tether line was severely damaged at the termination point after the socket was caught on the bucket of the base machine. When the operator started to walk the harvester downhill, the line broke at relatively low tension. An investigation found that the flat edge of the socket could catch against the lower sheave housing when the bucket was being moved, which can cause damage to the wire rope. The line and termination point should have been inspected after the operator heard an unusual sound and saw it whip. The owner and operator both reported that they had regularly seen the lines come tight when repositioning the base machine but did not recognize that it could indicate a problem or potential line damage.
Fortunately, there were no injuries resulting from this incident.
RECOMMENDATIONS FOR CORRECTIONS
- Always inspect cables and connections after repositioning the base machine.
- After repositioning the base machine, test components before starting up work by putting the system into auto high tension and moving the SSM back and forth on gentle ground while observing the line and connection points.
- Stop and thoroughly inspect lines if something unusual occurs. In this case, the “popping” sound and line whip should have triggered an inspection.
- Make sure the termination point sockets are positioned so that they cannot rub or catch on the lower sheaves on the boom arm before moving the base machine or the bucket.
- Bevel the edges on the sheave so that the flat edge of the socket cannot catch on it.
- Keep line tension low and do not set the parking brake when digging in the bucket.